I have been busy with work and with busy designing my new look web site. So far all has gone reasonably well. I had a few issues uploading my images of the House Build last night, it seems that my hosting company had a few issues, as tonight the images have gone up without issue.
I will start with the new look site. I have been toying with a number of ideas, but none of them really appealed to me, they also caused me a few dramas with the design. Dreamweaver CS4 has some strange quirks with templates. I have had these problems before on previous versions. Thankfully I have powered on and worked through them, although, I have to say that I am still not 100% happy. Lets say it is down to the end user more than the program. My new site will be based on Photography, Video, Music and design. It will also feature the Mac and a little mention here and there on the PC. The site is still being worked on and toyed with, so don’t hold your breath, as I have yet to finish a web site of my own.
The House build. So far it is going well. There are a few hiccups, as to be expected with builders, plumbers and sparkies. They will always find an excuse to not be there when they are supposed to. It seems that the plumbing has taken a bit of a hammering from the major cleanup today. They have completed the task of putting storm water drains in and in this task have managed to damage 4 of the pipes used for water and sewer. I could understand this if they were just white, but they were sprayed yellow so they would stand out from the grey/white slab. The slab has now been cleared off and all the dirt moved off to fill in the drainage channels dug out to accommodate the pipes. Now residing on the slab is a selection of wooden frames, RSJ’s and other items. Hopefully this week the building will actually look like a house, or at least the makings of a house.
Work. I had to replace the switches in the small rack as one had given up the ghost and the other was old and only 100Mb connection. So off to the shop and 2 x 16 port switches and some new cat6 patch leads. So a complete rewire of the rack and finally get everyone and everything on the network connecting at 1Gb. Some would argue that there is no difference. At this point I would agree as the main link from the small rack is only cat5 cable and is double backing from outlet to rack then back to the main rack. Hopefully soon to be rewired correctly – Don’t ask, my predecessor had no idea.
The Mac…It works and works well. Need I say more?



